Hostname: page-component-cd9895bd7-mkpzs Total loading time: 0 Render date: 2024-12-30T19:42:25.565Z Has data issue: false hasContentIssue false

Starting up of the second furnace at the Sollac Florange hot strip mill

Published online by Cambridge University Press:  25 October 2002

Get access

Abstract

In September 1998, the Sollac Florange HSM started up its second reheating furnace, with nearly the same size and thermal power as the first furnace built in 1983. This equipment has introduced new techniques, such as pulse width modulation on lower zones in order to control thermal power, or gas characteristics fine tuning with the correctometer using a furnace with only one burner, etc. Using two furnaces instead of one and a higher reheating capacity means some significant changes for the other tools of the HSM.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2001

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)