The design and the early commissioning of the ELI-Beamlines laser facility’s 30 J, 30 fs, 10 Hz HAPLS (High-repetition-rate Advanced Petawatt Laser System) beam transport (BT) system to the P3 target chamber are described in detail. It is the world’s first and with 54 m length, the longest distance high average power petawatt (PW) BT system ever built. It connects the HAPLS pulse compressor via the injector periscope with the 4.5 m diameter P3 target chamber of the plasma physics group in hall E3. It is the largest target chamber of the facility and was connected first to the BT system. The major engineering challenges are the required high vibration stability mirror support structures, the high pointing stability optomechanics as well as the required levels for chemical and particle cleanliness of the vacuum vessels to preserve the high laser damage threshold of the dielectrically coated high-power mirrors. A first commissioning experiment at low pulse energy shows the full functionality of the BT system to P3 and the novel experimental infrastructure.