Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by Crossref.
Cai, X.
and
Zhou, S.
1997.
Sequencing jobs with random processing times to minimize weighted completion time variance.
Annals of Operations Research,
Vol. 70,
Issue. 0,
p.
241.
Yu, Tae-Sun
Kim, Hyun-Jung
Jung, Chanhwi
and
Lee, Tae-Eog
2013.
Two-stage lot scheduling with waiting time constraints and due dates.
p.
3630.
Yu, Tae-Sun
Kim, Hyun-Jung
and
Lee, Tae-Eog
2017.
Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs.
IEEE Transactions on Semiconductor Manufacturing,
Vol. 30,
Issue. 2,
p.
155.