Hostname: page-component-cd9895bd7-7cvxr Total loading time: 0 Render date: 2024-12-26T07:48:59.875Z Has data issue: false hasContentIssue false

Metop-C deployment and start of three-satellite operations

Published online by Cambridge University Press:  09 March 2020

P.L. Righetti*
Affiliation:
Flight Operations Division, EUMETSAT, Eumetsat Allee 1, Darmstadt, 64295, Germany
J.M. de Juana Gamo
Affiliation:
Flight Operations Division, EUMETSAT, Eumetsat Allee 1, Darmstadt, 64295, Germany
F. Sancho
Affiliation:
Flight Operations Division, EUMETSAT, Eumetsat Allee 1, Darmstadt, 64295, Germany

Abstract

Metop is the space segment of the EUMETSAT Polar System (EPS), which provides real-time data to several European meteorological services as well as to the National Oceanic and Atmospheric Administration (NOAA) and other international agencies. The third Metop satellite, Metop-C, was launched on 7 November 2018 and shall enter in operations in few months, once the on-going commissioning of the meteorological products is completed. Each Metop satellite was designed to operate at least five years. A sequential deployment of the satellites was foreseen to achieve the target mission duration of 15 years, replacing an old one at end of life with a newer one; thanks to the excellent performances of the launchers and of the platform itself, and to continuous improvements to the fuel management, it was possible to extend the operational life of each satellite by a factor of three, still maintaining enough fuel to perform safe de-orbiting operations (foreseen for Metop-A, launched in 2006, at the end of 2021). This provided the opportunity to develop in 2012 (after Metop-B launch) dual-satellite products, which now, with the arrival of Metop-C, can evolve to tri-satellite; several decisions, concerning the selection of launch date and time as well as commissioning and operational locations, had to be been taken to achieve the target configuration; the analyses leading to these decisions are discussed here.

Type
Research Article
Copyright
© The Author(s) 2020. Published by Cambridge University Press on behalf of Royal Aeronautical Society

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

Footnotes

A version of this paper was first presented at the 18th Australian International Aerospace Congress in February 2019.

References

REFERENCES

Righetti, P.L. and Dyer, R. Feasibility of Metop-A mission extension on drifting local time, 26th ISSFD, 2017, Matsuyama, Japan.Google Scholar
Sancho, F., Paulino, T., de Juana Gamo, J.M. and Righetti, P.L. Metop-A de-orbiting using very large in-plane maneuvers, 25th ISSFD, 2015, Munich, Germany.Google Scholar
Damiano, A., Lang, R., Sancho, F. and Righetti, P.L. Flight dynamics support to extend Metop instruments useful lifetime, 26th ISSFD, 2017, Matsuyama, Japan.Google Scholar
Damiano, A., Lang, R. and Righetti, P.L. Flight dynamics analysis of extended lifetime for the Metop-A GOME-2 instrument, 27th ISSFD, 2019, Melbourne, Australia.Google Scholar
Sancho, F., de Juana Gamo, J.M. and Righetti, P.L. Avoidance of radiofrequency interferences with Metop-A and Metop-B during Metop-C early operations, 27th ISSFD, 2019, Melbourne, Australia.Google Scholar