Hostname: page-component-cd9895bd7-dzt6s Total loading time: 0 Render date: 2024-12-28T07:23:08.325Z Has data issue: false hasContentIssue false

Potential Traffic Demand in the London Area

Published online by Cambridge University Press:  04 July 2016

Extract

The June 1963 Report of the Inter-Departmental Committee on the Third London Airport concluded that a third London Airport would be required in the early 1970's, and possibly a fourth soon after 1980. It also brought out that because of the large amounts of air space required for the sequencing areas and approach paths of each airport, and because of limitations imposed by the positioning of the main air traffic routeings, the choice of possible sites within reasonable distance of Central London for the third airport was severely restricted. In a postscript to the Report, it was recognised that after the third airport has taken over a further block of air space, the difficulty of siting a fourth airport would be even more severe.

Type
Future Developments in the Air Transport System
Copyright
Copyright © Royal Aeronautical Society 1965

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)