No CrossRef data available.
Published online by Cambridge University Press: 18 March 2016
We analyse the survival time of a general duplex system sustained by an auxiliary cold standby unit and subjected to priority rules. The duplex system is attended by two general repairmen Rp and Rh . Repairman Rp has priority in repairing failed units with regard to repairman Rh provided that both repairmen are jointly idle. Otherwise, the priority is overruled. The auxiliary unit has its own repair facility. The duplex system has overall, break-in priority (often called pre-emptive priority) in operation and in standby with regard to the auxiliary unit. The analysis of the survival time is based on advanced complex function theory (sectionally holomorphic functions). The main problem is to convert a functional equation into a (parameter dependent) Sokhotski–Plemelj problem.