Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by Crossref.
Kapur, P.K.
and
Kapoor, K.R.
1975.
A 2-Unit Warm-Standby Redundant System With Delay and One Repair Facility.
IEEE Transactions on Reliability,
Vol. R-24,
Issue. 4,
p.
275.
Okumoto, K.
and
Osaki, S.
1976.
Repair limit replacement policies with lead time.
Zeitschrift für Operations Research,
Vol. 20,
Issue. 3,
p.
133.
Osaki, Shunji
and
Yamada, Shigeru
1976.
Age Replacement with Leadtime.
IEEE Transactions on Reliability,
Vol. R-25,
Issue. 5,
p.
344.
Mine, Hisashi
and
Kawai, Hajime
1977.
Optimal Ordering and Replacement for a 1-Unit System.
IEEE Transactions on Reliability,
Vol. R-26,
Issue. 4,
p.
273.
YAMADA, SHIGERU
and
OSAKI, SHUNJI
1978.
Optimum checking request policies.
International Journal of Systems Science,
Vol. 9,
Issue. 5,
p.
579.
Yamada, Shigeru
and
Osaki, Shunji
1980.
Checking request policies for a one-unit system and their comparisons.
Microelectronics Reliability,
Vol. 20,
Issue. 6,
p.
859.
Kumar, Ashok
and
Agarwal, Manju
1980.
A Review of Standby Redundant Systems.
IEEE Transactions on Reliability,
Vol. R-29,
Issue. 4,
p.
290.
Kapur, P.K.
Kapoor, K.R.
and
Kapil, D.V.S.
1980.
Joint Optimum Preventive-Maintenance and Repair-Limit Replacement Policies.
IEEE Transactions on Reliability,
Vol. R-29,
Issue. 3,
p.
279.
Bosch, K.
1981.
DGOR.
p.
229.
Agarwal, Manju
and
Kumar, Ashok
1981.
Analysis of a repairable redundant system with delayed replacement.
Microelectronics Reliability,
Vol. 21,
Issue. 2,
p.
165.
Bosch, K.
and
Jensen, U.
1983.
Instandhaltungsmodelle — Eine Übersicht.
Operations-Research-Spektrum,
Vol. 5,
Issue. 3,
p.
129.
Zijlstra, M.
1983.
Optimization of preventive maintenance for two-unit cold standby redundant systems with a general cost structure.
Zeitschrift für Operations Research,
Vol. 27,
Issue. 1,
p.
55.
de Almeida, A.T.
and
Campello de Souza, F.M.
1993.
Decision theory in maintenance strategy for a 2-unit redundant standby system.
IEEE Transactions on Reliability,
Vol. 42,
Issue. 3,
p.
401.
SHEU, SHEY-HUEI
1996.
Optimum age replacement of a system subject to shocks with random lead time.
International Journal of Systems Science,
Vol. 27,
Issue. 12,
p.
1417.
Liao, Wei‐peng
and
Yuan, John
1998.
Optimal replacement for a one‐unit system subject to delivery and test.
Journal of Quality in Maintenance Engineering,
Vol. 4,
Issue. 1,
p.
51.
Dohi, T.
Kaio, N.
and
Osaki, S.
2000.
Maintenance, Modeling and Optimization.
p.
155.
Shey-Huei Sheu
and
Griffith, W.S.
2001.
Optimal age-replacement policy with age-dependent minimal-repair and random-leadtime.
IEEE Transactions on Reliability,
Vol. 50,
Issue. 3,
p.
302.
Kaio, Naoto
Dohi, Tadashi
and
Osaki, Shunji
2002.
Stochastic Models in Reliability and Maintenance.
p.
65.
Dohi, Tadashi
Kaio, Naoto
and
Osaki, Shunji
2003.
Handbook of Reliability Engineering.
p.
349.
Sheu, Shey-Huei
and
Chien, Yu-Hung
2004.
Optimal age-replacement policy of a system subject to shocks with random lead-time.
European Journal of Operational Research,
Vol. 159,
Issue. 1,
p.
132.