Hostname: page-component-cd9895bd7-hc48f Total loading time: 0 Render date: 2024-12-28T02:14:44.454Z Has data issue: false hasContentIssue false

Grand Design/Working Library: Life at LSE after Redevelopment

Published online by Cambridge University Press:  06 April 2005

Abstract

In 2001, the British Library of Political and Economic Science completed its two year building redevelopment. The Library is now in a modern environment that it had been in desperate need of. This article looks at the building, the layout of collections and services, public study spaces and office space. A view of how the Library works after three years in a new environment.

Type
Article
Copyright
© 2005 The British and Irish Association of Law Librarians

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)