No CrossRef data available.
Published online by Cambridge University Press: 25 October 2002
The revamping of pickling line No. 1 at Ferblatil, with an increase of its width, was completed at the beginning of 2001. The width increase provides new possibilities for the supply of metal to all finishing lines of the basin of Liège. The start up conditions of the revamped line and the first operational results are presented.