Hostname: page-component-cd9895bd7-mkpzs Total loading time: 0 Render date: 2024-12-27T23:24:44.802Z Has data issue: false hasContentIssue false

Optimization of the slab yard logistics at Sidmar

Published online by Cambridge University Press:  27 September 2004

Get access

Abstract

An automation project has been realized to raise the capacity, the logistic and delivery performances, to reduce the workforce needed and to optimize the use of transport vehicles. This project comprises automatic tracking of all slab displacements, done by overhead cranes and other transport vehicles. It also contains algorithms to generate optimized slab displacement commands. The position tracking of outside transport vehicles is done by GPS. The optimization algorithms will be described in some more detail, as well as the results of the complete system.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2004

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)