A certain number of changes have been made on the occasion of the relining of blast furnace B at Ghent. They oncern the design of the furnace and the improvement of its cooling system, the repair of the hot blast stoves, the replacement of part of the control equipment and the installation of new measuring devices. Environmental controls and improved working conditions were also at the origin of some changes. The result of this operation is a fine new furnace equipped with the latest measuring and control systems.