Hostname: page-component-cd9895bd7-p9bg8 Total loading time: 0 Render date: 2024-12-27T23:47:31.909Z Has data issue: false hasContentIssue false

TAKO - The new PLTCM at Thyssen Krupp Stahl AG in Beeckerwerth works

Published online by Cambridge University Press:  25 October 2002

Get access

Abstract

The new tandem mill of TKS was built as a five stand all six high mill and coupled with the pickling line in 2001. TAKO is equipped with a new generation of electrical control system. It guarantees best accuracy for product quality and tolerances right up to the edge of the strip.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2002

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)