Hostname: page-component-cd9895bd7-mkpzs Total loading time: 0 Render date: 2024-12-29T05:43:32.306Z Has data issue: false hasContentIssue false

Modernization of the primary dedusting of the Sidmar BOFs

Published online by Cambridge University Press:  04 June 2003

Get access

Abstract

A major investment programme is going on in the Sidmar steel plant. This programme will be described briefly. One of the investments was the modernization of the primary dedusting system of both BOF. The reason for this modification is twofold : reduction of the emissions through the flare stack and increase of the oxygen flow rate. This paper describes the existing equipment and all modifications made, the emission results and the very large influence on the BOF cycle time (reduction from more than 31 to 28 min only) leading to an important capacity increase of the BOF using a 1 out of 2 vessel operation.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2003

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)