Background
A well designed disaster plan is important for surviving a chaotic and usually unexpected situation with success, and the hospital preparedness plans (HPP) are an essential part of these plans.Reference Lennquist1,Reference Waeckerle2 These HPPs must be heavily individualized to a specific site. No HPP is suitable for all sites. Likewise, HPP should remain fluid and iterative documents, with changes being made in response to learnings from exercises or disaster responses.Reference Waeckerle2 While disaster response literature has emphasized the importance of after-action debriefing for both exercises and responses, there is little evidence to suggest that these debriefings consistently lead to meaningful changes in preparedness for the next disaster.
Surge capacity is a crucial point of a HPP since the awareness of limited surge capacity leads to a realization of the vulnerable aspects in the disaster plan, and emphasizes the need for more regional or national collaboration between hospitals during a disaster.Reference Kaji, Koenig and Lewis3 Previous studies have explored the overall national HPPs with selected hospitals, and the surge capacity preparedness, but with no comparison to previous experiences with disasters.Reference Stander, Wallis and Smith4–Reference ngrassia, Mangini and Azzaretto10
Finland has a population of 5.5 million inhabitants. At the time of the study period, the national organization of specialized medical treatment was divided into 21 hospital districts, where each had at least one university or central hospital receiving surgical emergency patients. Finland is not a geologically disaster-prone country and acts of mass violence are rare. As natural disasters are absent and anthropogenic disasters and mass casualty incidents (MCI) are uncommon, the experience of such situations is scarce.
The primary aim of this study was to determine if a past disaster or MCI is associated with a change in a local hospital’s surge capacity preparedness. The null hypothesis of no difference in surge capacity preparedness between hospitals with exposure to previous disasters and those with no exposure was tested against the two-sided alternative hypothesis of significant difference. The secondary aim was to tabulate the overall national hospital preparedness in the country.
Methods
Ethics
This study was approved by the Institutional Review Board (IRB) of the Hospital District of Helsinki and Uusimaa (protocol number HUS/917/2021). All HPPs were handled confidentially, and in accordance with the World Health Organization (WHO) recommendations, the participating hospitals’ names and locations were treated as confidential information when reporting the data. The HPPs were obtained with the consent of each hospital district’s medical directors knowing the purpose of this study.
Study Design and Participants
Current HPPs of University and central hospitals receiving surgical emergency patients were collected directly from each hospital district’s medical directors by a request through e-mail or phone. Twenty hospital districts were included (Figure 1). The HPP of the Åland Islands, which is an autonomous region of Finland, was excluded for its unique regional status. Hospitals that do not receive surgical emergency patients under normal circumstances were excluded from the study. The data collection started in June 2019, and for those who did not respond, a second request was made later that year. Nineteen hospital districts answered the request. Only one hospital district did not respond to multiple requests. Altogether 28 medical contingency plans from 19 hospital districts were collected; one district had nine hospitals, one had two, and 17 districts had one hospital each, which fulfilled the inclusion criteria. The disasters and MCIs in Finland during the past 25 years (January 1, 1994 – December 31, 2018) were collected from official archives.11
Evaluation Tool
The medical contingency plans were read and analyzed by the principal investigator (AK) using the all-hazards WHO hospital emergency checklist tool.12 The checklist was designed for hospital administrators and emergency managers and contains 9 key components: command and control, communication, safety and security, triage, and surge capacity, as well as continuity of essential services, human resources, logistics & supply management, and post-disaster recovery. Each of these key components are further divided into 7 to 15 subcomponents or recommended actions, with 3 levels of progress. In this study, 8 key components comprising 67 action items were selected and evaluated. The key component of logistics and supply management was excluded since in Finland, it is part of different preparedness plans and regulated by law.13 Some items of other key components were excluded from all analyses due to the inability to analyze them based only on the written HPPs (Appendix 1: Supplementary Table). Three levels of progress were determined in the checklist: pending review, in progress, and completed.12 The items were scored in each HPP based on these 3 levels of progress; 0 points if the item was not mentioned in the HPP at all, 1 point if it was considered at some level, and 2 points if the item was interpreted to be thoroughly discussed in the HPP. The maximum score was 134 and the minimum, 0. The key component of surge capacity in the WHO checklist is divided into 13 actions, including calculating the maximal capacity required for patient admission and care, designating care areas for patient overflow and cancelling nonessential services.12 For surge capacity, all 13 subjects were included, and the maximum score was 26. Results of the evaluation were classified by the method used by Aldahari et al., and Ingrassia et al., with scores greater than 70% considered to be effective, scores of 35% to 70% classified as insufficient, and scores less than 35% being labelled as unacceptable.Reference ladhrai, Djalali and Della Corte5,Reference ngrassia, Mangini and Azzaretto10
Statistical Analysis
All data is presented as median (range, minimum, and maximum) or numbers (%), unless stated otherwise. The scores of key components were compared by the percentage of the maximum score. Pairwise comparisons of continuous variables were performed using the Mann-Whitney U test. A P value of less than 0.05 was considered statistically significant and all statistical analyses were performed using SPSS software version 27.0 (IBM Corp., Armonk, NY, USA).
Results
Table 1 shows the 12 disasters and MCIs in Finland during the past 25 years. There have been three anthropogenic disasters and nine anthropogenic MCIs: six traffic accidents, five acts of violence or terrorism, and one building site explosion; in total, 77 deceased, and 425 injured persons. No disasters or MCIs caused by a natural hazard have been recorded in the past 25 years. These 12 disasters and MCIs occurred in the area of nine hospitals (three in one, two in one, and one in seven hospitals each, respectively), and six hospital districts (six in one, two in one, and one in four hospital districts each, respectively). All the HPPs of the hospitals which had experienced a disaster in their area, and which were analyzed in the study, were updated after the last disaster.
* MCI, Mass Casualty Incident.
† Disaster.
MCI is defined as an event where a significant demand on the area’s medical resources and personnel takes place without overwhelming response capabilities, while in a disaster it does overburden the system.Reference Hirshberg, Holcomb and Mattox20 Terrorism can be identified as an act of mass violence with a political, religious, ideological, or social motivation, and intent to reach a larger audience without monetary gain with the manifestation of an enemy.Reference Hunter, Ginn and Storyllewellyn34
The overall preparedness level in Finnish hospitals was 75.7% with a minimum of 63.4%, and a maximum of 87.3% (Figure 2). The highest overall scores were in command and control (median 92.9%, minimum 71.4%, maximum 100%) and safety and security (90.2%, 68.8%, 100%, respectively). The lowest overall scores were in post-disaster recovery (median 50.0%, minimum 10.0%, maximum 100%) and surge capacity (65.4%, 42.3%, 80.8%, respectively). Preparedness was better in triage (median 80.0%, minimum 65.0%, maximum 95.0%), continuity of essential services (80.0%, 60.0%, 90.0%, respectively), and communication (77.8%, 66.7%, 94.4%, respectively) than it was in human resources (67.5%, 50.0%, 100%, respectively). The widest range among hospitals was seen in post-disaster recovery (90%). With the effective level considered as 70%, the key aspects of command and control, safety and security, triage, and continuity of essential services, as well as communication, were effective in the hospitals.
There was no statistical difference between the surge capacity score of the hospitals which had a disaster or MCI in their area during the past 25 years, compared to those which did not (65.4% for both, P = 0.735) (Figure 3).
Due to the wide range in post-disaster recovery scores, the comparison was also analyzed post-hoc for that key component. Again, there was no statistically significant difference of scores between hospitals that had experienced a disaster and those that did not (50% for both groups, P = 0.772).
Limitations
This study had several limitations. The HPPs were only analyzed based on the written medical contingency plans without further interviewing the hospital personnel and management. The HPPs were read and analyzed by only one person and thus susceptible to some bias. The study was conducted over 12 months due to COVID-19 pandemic. However, the HPPs were read and analyzed three times to enhance the consistency of the analysis. This study used the previously published WHO tool, and while several study groups have used multiple tools to evaluate the hospital preparedness plans, no single tool has been proven to be superior.Reference Nekoie-Moghadam, Kurland and Moosazadeh14,Reference Heidaranlu, Ebadi and Khankeh15 For helping the evaluation of this complex aspect and enabling comparison with other plans and countries, a more valid and reliable tool for evaluating hospital preparedness and surge capacity should be developed and validated.Reference Heidaranlu, Ebadi and Khankeh15,Reference Rezaei, Maracy and Yarmohammadian16 Some action items were excluded in the study due to the inability to analyze them based only on the written HPPs; thus possibly impairing the reliability of the tool, but for surge capacity, all 13 action items were included. As the study was not randomized, it would be impossible to randomize hospitals to experience a disaster; it is theoretically possible that hospitals experiencing a disaster had a lower baseline surge capacity score than others. In addition, while the study was able to show that experiencing a disaster did not appear to alter surge capacity preparedness, it did not explore why. Specifically, the study did not address debriefing techniques, how hospitals revise their plans, or how the hospital attempted to turn the lessons observed into lessons learned.
Discussion
This study found no significant difference in the quality of surge capacity preparedness between hospitals that had previously been exposed to a disaster and those that had not. The median score of surge capacity in the hospitals studied was only 65% on the WHO HPP checklist, and thus classified in the “insufficient” category. This suggests that simply experiencing a disaster does not automatically lead to improvement in surge capacity preparedness as measured by the WHO checklist.
The level and effectiveness of preparedness in Finnish hospitals bear comparison with other countries: in the Netherlands in 2002, 89% of hospitals had a disaster plan, in Switzerland in 2018 the same number was 92%, and in South Africa in 2008, it was 93%.Reference Stander, Wallis and Smith4,Reference Dell’Era, Hugli and Dami17,Reference van Remmen18 In 2012, the average hospital preparedness level for disaster management amongst 27 European Union member states was 54% when analyzed using a modified WHO toolkit.Reference Djalali, Della Corte and Foletti19 In Italy, 3 out of 15 hospitals (20%) and in Yemen, one out of 11 hospitals (9%) had an effective preparedness level with an average overall preparedness level of 56%, and 38% respectively.Reference ladhrai, Djalali and Della Corte5,Reference ngrassia, Mangini and Azzaretto10
The less than adequate consideration of surge capacity in HPPs is a worldwide phenomenon.Reference Stander, Wallis and Smith4–Reference ngrassia, Mangini and Azzaretto10 In hospitals in Italy and Yemen, the average surge capacity level was 42% and 38% respectively, when analyzed using the WHO checklist.Reference ladhrai, Djalali and Della Corte5,Reference ngrassia, Mangini and Azzaretto10 In Canada, only 54% of the examined hospitals were aware of their surge capacity, while in South Africa, only 26% were aware.Reference Stander, Wallis and Smith4,Reference Nantais, Gabbe, Nathens and Gomez6 In a study of 53 Swedish hospitals, the surgical surge capacity could be increased 3.8-fold in respect of trauma teams, surgical theaters, and intensive care unit (ICU) beds available in 8 hours, but their daily usage levels were not analyzed.Reference Blimark, Örtenwall and Lönroth9 In USA, 50 - 86% of the examined hospitals had taken into consideration different parts of the surge capacity, like cancellation of elective procedures, and setting up alternate care areas.Reference Kaji and Lewis7,Reference Niska and Shimizu8
There are several reasons why exposure to a disaster may fail to lead to meaningful improvements in surge capacity preparedness. First, it is unclear if all institutions had a structured debriefing process to facilitate the translation of observations into meaningful changes in the disaster plan. This echoes the common theme that lessons observed are not always lessons learned. Second, hospitals who succeed in responding to a disaster may be eager to emphasize the successes in their response, and hesitant to acknowledge the shortcomings. They may feel that no changes are needed to their disaster plans, as they were able to cope with the situation. However, the low overall scores of the surge capacity plans in Finland suggests that improvement is in fact needed. Finally, as disasters are infrequent events, disaster planning may require much more deliberate evaluation and planning to maintain institutional expertise when compared to more normal day-to-day operations.
The overall level of surge capacity preparedness in Finland was insufficient as per the WHO tool: this may be synonymous to the examples of other western countries. Surge capacity is an important marker for overall hospital preparedness, as it is limited not only by the number of beds in the emergency department (ED) and wards, but also by the resources of the ICU, operating rooms, and trauma teams.Reference Lennquist1,Reference Kaji, Koenig and Lewis3,Reference Hirshberg, Holcomb and Mattox20–Reference Sheikhbardsiri, Raeisi and Nekoei-Moghadam22 Surge capacity can be locally enhanced (especially in a disaster situation) by maneuvers such as cancelling elective procedures and admissions, adding extra beds, discharging inpatients, and finding alternative sites for care, particularly for less injured and ill patients.Reference Kelen, Kraus and McCarthy23,Reference Knouss24 In some papers, the realistic surge capacity of a hospital is thought to be 20% more than its usual capacity.Reference ladhrai, Djalali and Della Corte5,Reference ngrassia, Mangini and Azzaretto10 Mathematical models have been introduced to calculate the surge capacity, but they rely heavily on available beds in the ED, which studies show is not the critical part in surge capacity.Reference Lennquist1,Reference Hirshberg, Holcomb and Mattox20,Reference Bayram, Zuabi and Subbarao25,Reference Faccincani, Della Corte and Sesana26 The ineffective level of surge capacity in Finnish hospitals might be due to the lack of proper methods for measuring the complex surge capacity or the fact that hospitals tend to overestimate their surge capacity before a disaster or MCI occurs.Reference Kaji, Koenig and Lewis3,Reference Hirshberg, Holcomb and Mattox20,Reference Kaji, Koenig and Bey21 In addition, as the demands for patient care continue to grow, many of the resources previously considered as surge capacity reserves are being used on a daily basis, thus reducing the real reserve capacity during a MCI or disaster.Reference Lennquist1,Reference Kaji, Koenig and Lewis3,Reference Schafermeyer and Asplin27 Increased demands in health care, centralization of treatment, closure of smaller local hospitals, and nursing shortage has led to overcrowded EDs and aggravated access to primary and specialty care, leading to many hospitals working at full capacity on a daily basis.Reference Kaji, Koenig and Lewis3,Reference Niska and Shimizu8,Reference Schafermeyer and Asplin27–Reference Sequeira29 Until now, each of the 21 hospital districts in Finland have been authorized to create, rehearse, and implement their own medical contingency plan without uniform standards.13 The lack of a national strategy for disaster preparedness could be contributory, as it may be unrealistic to rely on individual hospitals alone to cope with a disaster in their area.Reference Kaji, Koenig and Lewis3,Reference Franco, Toner and Waldhorn30 This study suggests that more consideration and improvement should be directed towards surge capacity in the HPPs in Finland.
Several other interesting insights can be collected from the WHO evaluation checklist scores. This study found that in Finland, at least 97% (28/29) hospitals receiving surgical emergency patients had a written HPP. Overall preparedness level was 76% when analyzed using the WHO checklist, thus considered as “effective.” Finland is a small country in Northern Europe; part of the European Union with a comprehensive social security system, and public healthcare funded by taxation. After the Winter War and Continuation War (1939 – 1944), Finland developed into a politically non-violent and stable country. In 2020 it was 14th in the Global Peace Index ranking out of 152 countries involved. Currently, Finland is not a geologically disaster-prone country, as seen in the fact that no natural disasters or MCIs have occurred in Finland during the past 25 years. It is also a safe country where only 12 anthropogenic disasters and MCIs occurred during the last 25 years. However, even a moderate number of casualties arriving at the same time to an ED may require special arrangements to be taken into consideration, and thus they can be considered as an MCI: the three incidents labeled as a disaster had 79 – 171 casualties each, thus overwhelming local hospital’s resources. Enhancing the impact of these disasters and MCIs, the hospital staff in a non-disaster-prone country might not feel adequately prepared to confront and work in a disaster.Reference Gowing, Walker and Elmer31 The attitude, knowledge, and skills of the hospital staff can be enhanced with training.Reference Hirshberg, Holcomb and Mattox20,Reference Gowing, Walker and Elmer31 A proper HPP which includes the key aspects is a crucial part of the disaster response.Reference Lennquist1,Reference Waeckerle2,Reference Lewis and Aghababian32 The wide coverage of HPPs in Finland may also be explained by the fact that it is mandatory by law for hospital districts to have a medical contingency plan.13 Finland’s military history, size of the population, and wide public health care may explain the overall effective level of HPPs throughout the country.
In the HPP, the area with the most coverage in Finland, is command and control (WHO checklist level 93%). This may reflect the highly organized Finnish Defense Forces. As in the military, a designated Incident Command System consisting of everyday key management staff with additional units or persons is also a widely accepted key feature in the HPP. The hospital incident command system is preferably a linear, hierarchical organization with specific tasks; this is crucial to manage a chaotic and unpredictable situation of a disaster or MCI.Reference Lennquist1,Reference Lewis and Aghababian32,Reference Born, Briggs and Ciraulo33 The least prepared aspect nationally, was the post-disaster recovery plan (WHO checklist level 50%). Despite often being understated in the hospital disaster plan, the recovery phase might last from weeks or months, and with increased patient visits in ED, and physically and emotionally tired workers, it may require additional resources, and thus should not be ignored in a plan.Reference Lewis and Aghababian32,Reference Born, Briggs and Ciraulo33 The scarce incidence of disasters and MCIs in Finland during the last 25 years might explain the ineffective preparedness in post-disaster recovery.
The primary aim of this study was to determine if surge capacity preparedness differs between hospitals that have previously been exposed to a disaster, and those that have not. This study suggests that exposure to a disaster does not necessarily lead to increased surge capacity when compared to other hospitals in the same country. The results suggest that disaster medicine responders may need to seek a more deliberate or structured approach in turning experience with one disaster into deliberate preparation for the next. In addition, the study suggests that as overall surge capacity preparation in Finland is low, further efforts should be implemented for improvement.
To the best of our knowledge, this is the first study to evaluate hospital disaster preparedness in Finland using an internationally standardized tool. The WHO all-hazard tool Hospital emergency response checklist contains the main key components of a HPP and has been used in previous studies.Reference Waeckerle2,Reference ladhrai, Djalali and Della Corte5,Reference ngrassia, Mangini and Azzaretto10,Reference Rezaei, Maracy and Yarmohammadian16,Reference Djalali, Della Corte and Foletti19 This study is also one of the most comprehensive studies exploring overall national hospital preparedness in a developed non-disaster-prone country with 97% of nation’s hospitals included in the study.
Conclusion
In this study, there was no significant difference between hospital surge capacity preparedness in hospitals that had been exposed to a disaster, and those that had not. This indicates that simply experiencing a disaster is not adequate to guarantee that a hospital is more prepared for a disaster. In Finland, the overall hospital preparedness level is effective, with ‘command and control’ being the best covered area, and ‘post-disaster response’ the least acknowledged part. The overall level of surge capacity preparedness was 65% using the WHO checklist: “insufficient” by published standards. The study suggests that disaster planning should include structured and meaningful post-action processes to ensure that lessons observed during disaster response are translated into substantial improvements in disaster preparedness.
Supplementary material
To view supplementary material for this article, please visit https://doi.org/10.1017/dmp.2024.1
Availability of data and materials
The datasets analyzed during the current study are available from the corresponding author on reasonable request, with the consideration of the confidentiality principle specified in the article.
Authors’ contributions
AK, JMF, and EH designed the study concept. AK and EH collected the data (medical contingency plans), and AK carried out the analysis and interpretation of the data, as well as statistical analysis with the guidance of JMF. AK also did the drafting of the manuscript, while JMF and EH revised the manuscript before submission. All authors read and approved the final manuscript.
Funding
This research received no specific grant from any funding agency in the public, commercial, or not-for-profit sectors.
Competing interests
JMF is the CEO and founder of STAT59 (Stat59, Edmonton, Alberta, Canada). The remaining authors declare that they have no competing interests.
Ethics approval and consent to participate
Not applicable (not involving the use of any animal or human data or tissue, but the data for analysis was given with the permission of each hospital district’s medical directors knowing the purpose of this study). This study was approved by the Institutional Review Board (IRB) of the Hospital District of Helsinki and Uusimaa (protocol number HUS/917/2021).
Consent for publication
Not applicable (not containing data from any individual person).
Authors’ information
This work is the result of a thesis submitted in partial fulfilment of the requirements for the degree of Master of Science in Disaster Medicine (European Master in Disaster Medicine).
Abbreviations
- ED
Emergency Department
- HPP
Hospital Preparedness Plan
- ICU
Intensive Care Unit
- IRB
Institutional Review Board
- MCI
Mass Casualty Incident
- WHO
World Health Organization